91
:-ground leveled in 1874 for the proposed New Civil Hospital, it's erection was soon after commenced; however it was stopped soon after being commenced, and the Contractor paid for the work he had done in altering the foundations, preparing ward and other work, etc., vide G.S. No. 2918 of 1878.
In the Colonial estimates for 1880 a sum of $2000 was again provided for its construction, but the work was not commenced in consequence of the different sites proposed by the Surveyor General not having been approved, vide L.N. No. 182, 218, and 253 of 29.9.80 and 26.10.80.
An amount has again been inserted in the Colonial Estimates for 1882 but nothing can be done towards its erection until the site shall have been approved, on which it is to be built.
Bignell
Acting Surveyor General
Surveyor General's Office
29th September, 1881.
*
91
:-ground leveled in 1874 for the proposed Nur Civils steepital, it's erection was
soon after
: however stapped soon
after being commenced, and the Sontractor paid
for
the work he had done in altering the foundations, preparing ward and tone work, ce, vide 6.5.9.2918 of 1878.
In the Colonial estimates for 1889 a sum of $2000 was
again provided for it's construction, but the work
was not commenced in consequence
of the different sites paposed by the Curayar sinerals not having been approved,
weede L4.0 N 182, 218, and 253
29.9.80
26.10.80
An amount has
$.11.85
again
of
been inserted
in the Colonial Estimates for 1882 but
nothing can
be done towards its erections
until
site shart have been approved,
on which it it to be brith
Bignels Genel Bundles
Acting Leaveyor Comerel
Swaneyar Jeneral's Office
29th september, 1881.